Project Profile: Scheff Foods

Scheff Foods

Introduction

High rish packing area where preparations of Samosa for frying are handmade as well as ready meals filled into plastic trays for heat sealing.

The area is capable of being held at 12oC. The floor is a polyurethane screed, which was installed with stainless steel drainage channels. The walls are stalvetite finished insulated panels, with the cook room contained within a 1 hour protected area using panels with rockwool core.

Project Objective

  • To convert an existing open plan warehouse into a full specification ready meal production facility.
  • To design the area requirements in terms of space and flow.
  • To appoint the design team and contractors to complete the project.
  • To reuse existing equipment wherever possible to keep within strict budgetary constraints.
  • To enable Scheff to attract interest for its products from retailers and institutional catering suppliers.

 

 

 

 

 

Scope of Project

The complete design of all areas of the factory to meet with the output requirements. By working with Scheff's management, we provided layouts and detailed designs for all aspects of the project including wall floors and services. We then assisted in locating and purchasing suitable premises which would meet the designs. This included preparing the necessary planning application and surveys. In addition, we advised on the choice of contract to be used and organised the tendering process. Once the work on site had commenced we acted as contract administrators and supervising officers to ensure all aspects of the contract ran smoothly. Transfer of existing equipment was co-ordinated to ensure the minimum operational downtime. To facilitate this the new cold store was completed earlxy to enable sufficient stock to be produced to cover a shut down period of 10 days.